兽交片免费区

  • <tr id='nF9UIQ'><strong id='nF9UIQ'></strong><small id='nF9UIQ'></small><button id='nF9UIQ'></button><li id='nF9UIQ'><noscript id='nF9UIQ'><big id='nF9UIQ'></big><dt id='nF9UIQ'></dt></noscript></li></tr><ol id='nF9UIQ'><option id='nF9UIQ'><table id='nF9UIQ'><blockquote id='nF9UIQ'><tbody id='nF9UIQ'></tbody></blockquote></table></option></ol><u id='nF9UIQ'></u><kbd id='nF9UIQ'><kbd id='nF9UIQ'></kbd></kbd>

    <code id='nF9UIQ'><strong id='nF9UIQ'></strong></code>

    <fieldset id='nF9UIQ'></fieldset>
          <span id='nF9UIQ'></span>

              <ins id='nF9UIQ'></ins>
              <acronym id='nF9UIQ'><em id='nF9UIQ'></em><td id='nF9UIQ'><div id='nF9UIQ'></div></td></acronym><address id='nF9UIQ'><big id='nF9UIQ'><big id='nF9UIQ'></big><legend id='nF9UIQ'></legend></big></address>

              <i id='nF9UIQ'><div id='nF9UIQ'><ins id='nF9UIQ'></ins></div></i>
              <i id='nF9UIQ'></i>
            1. <dl id='nF9UIQ'></dl>
              1. <blockquote id='nF9UIQ'><q id='nF9UIQ'><noscript id='nF9UIQ'></noscript><dt id='nF9UIQ'></dt></q></blockquote><noframes id='nF9UIQ'><i id='nF9UIQ'></i>
                 
                中文 / EnglishEmailWeibo
                News:

                Valve Replacing Under Pressure

                Valve replacing tools (VRUP) use a plugging system designed with the principle of a downhole packer.[detail]

                Plunger Lift.

                Wellhead effluent is a common problem in the later stages of oil and gas development. With the energy consumption of the reservoir, the gas flow rate is decreasing and the carrying [detail]

                Environmental Protection

                Top-Well provides systems for handling and treating oil field produced water, fracturing fluids and other flow back fluids. High concentrations of salts and other contaminants are t[detail]

                Manufacturing

                Snubbing units are designed and manufactured in a joint venture between Top-Well and Top-Tiger.[detail]

                Turbine MRO.

                Top-Well has held a contract for AHDEB Oil in Iraq for the operation and maintenance of gas turbine power stations in Iraq since 2011.[detail]

                Pipe Pick-up&Laydown

                Top-Well’s PULD crew has been conducting more than 2 years of PULD services for Chevron CDB project in Sichuan which is high H2S content gas well development with full client sati[detail]

                Wellhead Repairing

                Valves used on tree and tubing head are the critical well control device and should always be kept in sound condition during the well life.[detail]

                Snubbing Services

                The Snubbing Operation is one of the most adaptable techniques available in the upstream oil & gas industry. [detail]

                Partners

                • Room 503, Tower C, Ruipu Mansion, Hongjunying South Road,
                • Chaoyang District, Beijing, P.R. China.
                • Phone:010-64820099/77
                • Fax:010-64820669
                • Email:top-well@top-well.com

                Top-Well Petroleum Technology Co Ltd

                ?